Heavy Civil Works

Project Name:
Contract Number:
Project Value:
Owner:
Schedule:
Location:

Highway 66/566
2006-5152
$11 million
Ministry of Transportation Ontario
October 2006 to November 2007
Matachewan, Ontario

  

Project Description:
A new 3-span steel girder bridge is being constructed to replace the existing timber bridge.


Project Name:
Contract Number:
Project Value:
Owner:
Schedule:
Location:

Bathurst Street TTC Track Allowance
05SD-02RD
$1.5 million
City of Toronto
May to June 2005
Toronto, Ontario

  
Project Description:
This contract called for the reconstruction of the TTC Track Allowance on Bathurst Street from Front Street West to Queen Street West and from Dundas Street West to College Street.

Project Name:
Contract Number:
Project Value:
Owner:
Schedule:
Location:

Highway 404 HOV Tunnel
2003-2009
$26 million
Ministry of Transportation Ontario
September 2003 to August 2006
Toronto, Ontario

  
Project Description:
As part of the MTO's High Occupancy Vehicle lane initiative a tunnel was constructed to connect the southbound Highway 404 HOV lane to the westbound Highway 401 collector lanes.

Project Name:
Contract Number:
Project Value:
Owner:
Schedule:
Location:

Highway 401 Allen Road to Leslie Street
2002-2021
$49 million
Ministry of Transportation Ontario
September 2002 to October 2005
Toronto, Ontario

  

Project Description:
This 8.1 km stretch of Highway 401 was reconstructed and the structure rehabilitated. The rehabilitation work on the Hogg's Hollow structure posed some unique construction constraints. The Hogg's Hollow structure was situated directly above the West Don River.


Project Name:
Contract Number:
Project Value:
Owner:
Schedule:
Location:

Warden Avenue
05-110
$6.7 million
York Region
July 2006 to November 2007
Markham, Ontario

  
Project Description:
Warden Avenue was widened from McPherson Street to just south of Highway 407. The widening resulted in the reconstruction of the 14th Avenue and Warden Avenue intersection and the widening of the concrete structure over the CN rail lines.

Project Name:
Contract Number:
Project Value:
Owner:
Schedule:
Location:

Sgt. Aubrey Cosens VC Memorial Bridge
2004-5122
$7 million
Ministry of Transportation Ontario
September 2004 to November 2005
Latchford, Ontario

  
Project Description:
The bridge rehabilitation included: 1) the removal and replacement of the complete hander system, structural steel, deck, 2) the construction of tie-ins to Highway 11 and 3) the removal of the temporary modular bridge and detour.

Project Name:
Contract Number:
Project Value:
Owner:
Schedule:
Location:

Highway 400 Major Mackenzie Drive
2002-2005
$18 million
Ministry of Transportation Ontario
August 2002 to December 2004
Vaughan, Ontario

     

Project Description:
A new Major Mackenzie Drive structure over Highway 400 was constructed adjacent to the existing structure. Once the new structure and ramps were complete, the traffic was shifted over and the existing structure was prepared for demolition. A full mainline closure of Highway 400 for eight hours was required to completely remove the bridge deck and sub-structure.


Project Name:
Contract Number:
Project Value:
Owner:
Schedule:
Location:

Bayview Avenue
01-105
$11.7 million
York Region
September 2001 to December 2002
Richmond Hill, Ontario

  

Project Description:
The project involved the extension of Bayview Avenue from Stouffville Road to Bloomington Sideroad. The extension required the construction of a new four lane road, and bridge and was all done in an environmentally sensitive area.


Project Name:
Contract Number:
Project Value:
Owner:
Schedule:
Location:

Highway 407 East Structures
C2103E
$7 million
SLF Joint Venture
May 2000 to September 2001
Markham, Ontario

  
Project Description:
As part of the toll highway's eastern expansion a number of overpasses needed to be constructed. This contract called for the construction of five structures: Markham Road, Ninth Line, Tenth Line, CP Rail eastbound and westbound.