Project Name: Contract Number: Project Value: Owner: Schedule: Location: |
Highway 11 2005-5144 $22 million Ministry of Transportation Ontario April 2006 to July 2007 North Bay, Ontario |
 |
|
Project Description: The 10km four lane reconstruction of Highway 11 was broken down into three stages in order to meet the Ministry's completion schedule. |
|
|
Project Name: Contract Number: Project Value: Owner: Schedule: Location: |
Markham Road & 16th Avenue 059-T-0 $1.2 million Town of Markham 2007 Markham, Ontario |
 |
Project Description: This intersection was reconstructed with new asphalt, coloured concrete crosswalks, concrete sidewalks and retaining walls. |
|
|
Project Name: Contract Number: Project Value: Owner: Schedule: Location: |
Dryden Regional Airport 05-10451-01 $2.8 million Dryden Regional Airport August to September 2005 Dryden, Ontario |
|
|
Project Description: The project called for the complete rehabilitation of the pavement on Runway 11-29, Taxiway Alpha and Apron I while the airport was still operational. |
|
|
|
Project Name: Project Value: Owner: Schedule: Location: |
National Soccer Stadium $350,000 PCL Constructors Canada Inc. January to June 2006 Toronto, Ontario |
 |
|
Project Description: In order to accommodate the new stadium the existing Princess Boulevard had to be realigned. |
|
|
Project Name: Contract Number: Project Value: Owner: Schedule: Location: |
Highway 404 Sheppard Avenue to Beaver Creek 2005-2025 $17.7 million Ministry of Transportation Ontario September 2005 to June 2007 Markham, Ontario |
 |
Project Description: Ten kilometers of Highway 404 northbound was widened to accommodate a High Occupancy Vehicle lane. In addition to one lane being added, the Steeles Avenue and Finch Avenue interchange ramps needed to be realigned. |
|
|
Project Name: Contract Number: Project Value: Owner: Schedule: Location: |
Highway 101 Relocation PPE025 $7.3 million Porcupine Joint Venture October 2005 to July 2006 Timmins, Ontario |
 |
Project Description: In order to accommodate the expansion of an existing open pit mine 6.2 kilometers of Highway 101 was relocated from the north side of Three Nations Lake to the south side of the lake. The size and location of the project required the use of a portable asphalt plant. |
|
|
Project Name: Contract Number: Project Value: Owner: Schedule: Location: |
Vandorf Sideroad PW2005-07 $2.8 million Town of Aurora June 2005- to August 2006 Aurora, Ontario |
 |
|
Project Description: This one kilometer reconstruction involved multiple changes to the profile of the road including raising the road grade by approximately 2 meters. The existing culvert was replaced with a much larger capacity cast in-place box culvert. The extreme ground water conditions required intense dewatering measures which included well points and continuous pumping. |
|
|
Project Name: Project Value: Owner: Location: |
Various Subdivisions $20,000-100,000 Con-Strada Construction Various locations across the Greater Toronto Area, Ontario |
 |
|
Project Description: The projects range from paving a small cul-de-sac to a full subdivision. |
|