This project was a parking area with loading docks of a large meat processing company. The work consisted of meeting with the General Building Contractor and Owner to compare the structural values in using conventional removal and replacement with full depth reclamation and resurfacing. Due to the area being a truck loading dock that had very unstable areas, the owners found it cost effective to stabilize the whole area with the full depth reclamation process in lieu of conventional patching and increased the structural value by 32 percent. A geotechnical engineering company retrieved samples and developed the mix design and the project was completed within a week. The owner was pleased that access to the dock area was maintained throughout construction and the work took less time to complete than the conventional method for removal and replacement.

  • Location:Birchwood Foods Norcross, GA
  • Contract Model:construction-manager-general-contractor
  • Project Status:RFQ - Qualification

Where to go from here

Related Projects

In the last 100 years we've worked on a lot of projects. Be sure to browser similar projects to this one.

See more related projects

Want to work for the best?

The Miller Group is a great place to work. Browse our current career and job opportunities and find yours.

Current Job Opportunities

Company Finder Tool

Not sure who to contact? Don't let the number of division at the Miller Group overwhelm you.

Use the Company Finder Tool