Ourprojects highways

Highways and Bridges

We build and maintain the infrastructure that keeps our communities moving and makes them strong.

404 Sheppard

Hwy 404 Reconstruction

In the spring of 2020 Brennan Paving and Construction (BPCL) successfully won the Highway 404 rehabilitation project from Highway 401 to Highway 7.

Toronto  ◆  Highways & Bridges
FMHP Header

Fredericton to Moncton Highway Project

New Brunswick’s first Public Private Partnership Highway Project. An early P3 project with a 30-year concession term, this 195 km, four-lane divided, controlled-access highway includes 21 interchanges, four of which were freeway-to-freeway, and 89 structures.

TransCanada Highway, Fredericton to Moncton, New Brunswick  ◆  Highways & Bridges
0942 SL16 INFRA IMG Champlain Bridge FULL EN e1494247333585

Champlain Bridge Replacement

The Champlain Bridge Replacement project includes a new bridge across the St. Lawrence River, a smaller bridge for Île-des-Soeurs (Nun’s Island) and reconstruction and widening of AutoRoute 15.

Montreal, Quebec  ◆  Highways & Bridges

Route 1 Gateway Project

The Route 1 Gateway Project consists of 240 kilometres of new 4 lane highway with interchanges, structures and road side assets. The project is located between the Canada/United States border in St. Stephen.

Saint John/Moncton, New Brunswick  ◆  Highways & Bridges
Harbor bridge us 181 existing e1494249620787

US 181 Harbor Bridge Replacement

The US 181 Harbor Bridge Replacement consists of replacing the existing Harbor Bridge and reconstructing portions of the US 181, I-37 and the Crosstown Expressway. The bridge will contain six lanes of the US 181 with a bicycle and pedestrian shared path. Overall, the project will consist of 6.44 miles of bridge and roadway development, construction and maintenance.

Corpus Christi, Texas  ◆  Highways & Bridges
S2 S Header BC Maintenance Truck e1503586319152

The Sea-to-Sky Highway Improvement

The Sea-to-Sky Highway Improvement (S2S) project improved safety and capacity along the highway, prior to the 2010 Winter Olympics is Whistler, British Columbia. This project includes a 25-year OMR term over 95km of 4-lane divided highway, on mountainous terrain that experiences severe winter weather and over 415 cm of snow annually.

Vancouver  ◆  Highways & Bridges

LET’S WORK TOGETHER

We succeed because we respect our people and invest in their development and well-being.

We’re always on the lookout for smart people with the drive to take on challenges, think about what our customers need in new and innovative ways, and deliver creative solutions.

JOIN OUR TEAM

Lets Work Together with Colas Logo