S2 S Header BC Maintenance Truck e1503586319152

The Sea-to-Sky Highway Improvement

Vancouver

The Sea-to-Sky Highway Improvement (S2S) project improved safety and capacity along the highway, prior to the 2010 Winter Olympics is Whistler, British Columbia. This project includes a 25-year OMR term over 95km of 4‑lane divided highway, on mountainous terrain that experiences severe winter weather and over 415 cm of snow annually.

Miller subsidiary Miller Capilano Maintenance Corporation (Miller) serves as the Lead Operations and Maintenance Firm with responsibility for the 25-year concession period. Miller had an active role during the design and construction phase, providing expertise regarding the impacts which design decisions and construction quality may have on maintenance costs, long-term life cycle, and overall performance of the highway. Miller was operational from the start of the project, including the construction phase, maintaining each highway section as it was completed.

Miller provides routine maintenance and operations of the facility and is responsible for rehabilitating all aspects of the highway including pavement, structures, signage and electrical. The project featured 48 new bridges and interchanges, over three million CY of rock excavation, two million CY of blasting, 500,000 tons of new asphalt pavement, 160,000 SF of MSE retaining walls and 50,000 feet of storm drains.

Summary

Client

British Columbia Ministry of Transportation

Year Completed

01/09/2034

LET’S WORK TOGETHER

We succeed because we respect our people and invest in their development and well-being.

We’re always on the lookout for smart people with the drive to take on challenges, think about what our customers need in new and innovative ways, and deliver creative solutions.

JOIN OUR TEAM

Lets Work Together with Colas Logo