Ourprojects highways

Highways and Bridges

We build and maintain the infrastructure that keeps our communities moving and makes them strong.

Duchesnay Creek Bridge Hero

Duchesnay Creek Bridge

Originally constructed in 1937, the Duchesnay Creek Bridge connects the City of North Bay and the Nipissing First Nation. In 2021, it was replaced with a one-of-a-kind structure, built using laminated, high-quality Douglas Fir girders.

North Bay  ◆  Highways & Bridges
Gardiner bridge hero

Gardiner Expressway Resurfacing

Each year, the City of Toronto shuts down the Gardiner Expressway for a weekend to perform selective resurfacing and maintenance. Brennan Paving & Construction Ltd, a subsidiary of the Miller Group, was the successful bidder in 2021.

Toronto  ◆  Highways & Bridges
Harbor bridge us 181 existing e1494249620787

US 181 Harbor Bridge Replacement

The US 181 Harbor Bridge Replacement consists of replacing the existing Harbor Bridge and reconstructing portions of the US 181, I-37 and the Crosstown Expressway. The bridge will contain six lanes of the US 181 with a bicycle and pedestrian shared path. Overall, the project will consist of 6.44 miles of bridge and roadway development, construction and maintenance.

Corpus Christi, Texas  ◆  Highways & Bridges
S2 S Header BC Maintenance Truck e1503586319152

The Sea-to-Sky Highway Improvement

The Sea-to-Sky Highway Improvement (S2S) project improved safety and capacity along the highway, prior to the 2010 Winter Olympics is Whistler, British Columbia. This project includes a 25-year OMR term over 95km of 4-lane divided highway, on mountainous terrain that experiences severe winter weather and over 415 cm of snow annually.

Vancouver  ◆  Highways & Bridges
Golden Ears Bridge

Golden Ears Bridge

Miller provides operations and maintenance services under a 32 year contract to Golden Crossing General Partnership for the Golden Ears Bridge and approach roads in Metro Vancouver, British Columbia.

Vancouver  ◆  Highways & Bridges
A25 Hero

Autoroute 25 Bridge and Highway

The first public private partnership (PPP) in Québec’s transportation market. The project included the finance, design, construction and maintenance of a new six‐lane 1.2km‐long bridge across the Rivière‐des‐Prairies and 7.2kms of approach roads. The river crossing is a combined cable‐stayed bridge and steel‐girder bridge.

Montreal  ◆  Highways & Bridges

LET’S WORK TOGETHER

We succeed because we respect our people and invest in their development and well-being.

We’re always on the lookout for smart people with the drive to take on challenges, think about what our customers need in new and innovative ways, and deliver creative solutions.

JOIN OUR TEAM

Lets Work Together with Colas Logo